Skip to product information
1 of 1

Armstrong 110108MF-717 Boiler Header Pump

Armstrong 110108MF-717 Boiler Header Pump

Brand: Armstrong SKU: 110108MF-717
Regular price $2,051.95 USD
Regular price Sale price $2,051.95 USD
Sale Out of Stock - Call to Order
Ships Direct from Distribution — Dispatches in 24–48 Hrs
Quantity
Official TIPS Contract Awarded Vendor Badge

TIPS Contract Vendor

We are an officially awarded purchasing cooperative vendor.

📋 Procurement & Shipping Notice

  • LTL Freight Dispatch: Heavy commercial units ship directly via insured LTL carrier with delivery coordination included.
  • Project Timelines & Submittals: Need guaranteed delivery dates, formal submittals, or tax-exempt processing?

👉 Request a Commercial Quote or contact our procurement team for direct freight scheduling.

🏢

Corporate Procurement & PO Processing

Formal Purchase Orders (POs) and tax-exempt ordering are accepted for commercial contractors and institutional facilities.

Apply for Trade Account & Terms →
Performance Parameter Engineering Baseline Value
Manufacturer Part Number (MPN) 110108MF-717
Model Designation Raypak 3 Boiler Header Pump

The Armstrong header pump is engineered to keep water moving through Raypak 3 boiler systems, ensuring consistent heat distribution and preventing stagnant flow. This unit, part 110108MF-717, replaces the original pump to restore optimal performance.

The pump utilizes a centrifugal impeller that draws water in through the inlet, accelerates it, and discharges it at a steady pressure, maintaining the boiler’s heat‑exchange efficiency while reducing pump cavitation risk.

Key System Performance Baselines:

  • Flow Capacity: up to 20 GPM at 30 psi, delivering reliable circulation.
  • Operating Speed: 2900 RPM, matching Raypak 3 boiler specifications.
  • Material Durability: cast‑iron body with corrosion‑resistant seals for long‑term service.
  • Power Consumption: 1 HP motor, optimizing energy use while providing robust performance.

⚠️ Application Profile: Suitable for residential and light‑commercial Raypak 3 boiler installations, retrofits, and replacement of failed header pumps in hydronic heating loops.

View full details