
Order the Big Ass Fans E-400-3601 Portable Evaporative Cooler from National Boiler Supply. Call our order desk at 850-565-3492 for a formal quote or a part number cross-check.
Technical Specifications
| Brand | Big Ass Fans |
|---|---|
| Manufacturer Part Number | E-400-3601 |
| Air Flow | 6,400/9,700 cfm |
| Average Coverage Area | 3600 sq ft |
| Blade Diameter | 36 in |
| Drive Type | Direct Drive |
| Pad Thickness | 8 in |
| Media Type | Cellulose |
| Horsepower | 3/4 hp |
| Amps | 8 A |
| Voltage | 120V AC |
| Pump Voltage | 110V AC |
| Phase | Single |
| Frequency | 60 Hz |
| NEMA Plug Configuration - HVAC | 5-15P |
| Power Cord Length | 10 ft |
| Water Connection | 3/4 in |
| Water Capacity | 46 gal |
| Fill Type | Hose |
Additional details: Number of Speeds Variable.
OEM Part Verification: Confirm Big Ass Fans part number E-400-3601 against your equipment nameplate or parts list before ordering. Our order desk can cross-check it for you.
Order Desk Support: Call 850-565-3492 for formal quotes, lead times, and volume pricing.
Related BIG ASS FANS Components & Replacement Parts
- Big Ass Fans E-500-5001 – Portable Evaporative Cooler, 12,500 to 20,000 CFM, 6,500 sq ft, 64 gal, 1-1/2 HP, Direct – OEM Part # E-500-5001
- Big Ass Fans E-350-2001 – Portable Evaporative Cooler, 50 gal, 2300sqft – OEM Part # E-350-2001
- Big Ass Fans F-EV1-1801 – Portable Evaporative Cooler, 700 to 2,800 CFM, 1,200 sq ft, 16 gal, 1/2 HP, Direct – OEM Part # F-EV1-1801
- Big Ass Fans CS-P105-C – Drain Plug, Rubber, 3 in W, 3 in L – OEM Part # CS-P105-C
- Big Ass Fans 009545 – Evaporative Cooler Accessory – OEM Part # 009545
Need help confirming a part number or cross-reference? Call our order desk at 850-565-3492.
Corporate Procurement & PO Processing
Formal Purchase Orders (POs) and tax-exempt ordering are accepted for commercial contractors and institutional facilities.
Apply for Trade Account & Terms →📋 Procurement & Shipping Notice
- LTL Freight Dispatch: Heavy commercial units ship directly via insured LTL carrier with delivery coordination included.
- Project Timelines & Submittals: Need guaranteed delivery dates, formal submittals, or tax-exempt processing?
👉 Request a Commercial Quote or contact our procurement team for direct freight scheduling.